Downloads
Downloads within the HPEM2GAS project
The results within the HPEM2GAS project have been divided in 7 different categories, please click the category to view the available reports.
Most of the reports are confidential (CO), in those cases only a public summary is available, which can be quite short.
Result categories
- Project coordination and management
- Specification, Harmonisation and regulation for grid services
- PEM electrolysis components, optimization and scaling-up
- MEAs and Stack optimisation
- System design and prototyping
- Field testing and validation
- Dissemination and preparative exploitation activities
- External downloads & more..
1. Project coordination and management
- Annual data reporting for the FCH Knowledge Management Tool (Year 1) by CNR-ITAE (CO)
- Annual data reporting for the FCH Knowledge Management Tool (Year 2) by CNR-ITAE (PU)
- Annual data reporting for the FCH Knowledge Management Tool (Year 3) by CNR-ITAE (PU)
2. Specification, Harmonisation and regulation for grid services
- Protocols for characterisation of system components and electrolysis system assessment by CNR-ITAE (PU)
- Complete set of technical and operational requirements for field-testing by SWE (CO)
- Background document on policies and regulations for grid-balancing service by CNR-ITAE (PU)
3. PEM electrolysis components, optimization and scaling-up
- Progress report on membrane and catalyst development and preparation of first batches of large area membranes and catalyst components for MEA development by SLV (CO)
- Final report on membrane development and the scaling up of membrane production and ‘pilot production’ of batches of large area membranes for MEA development (TRL6) by SLV (CO)
- Final report on the manufacturing of the catalysts including recombination catalysts meeting the specifications and scale-up to kg batches by CNR-ITAE (CO)
- Publishable report on catalyst development by CNR-ITAE (PU)
4. System design and prototyping
- MEA development with high catalyst utilisation by EWII (CO)
- Report on final MEA performance and stability properties by EWII (CO)
- Data-set on stack assembling and testing under realistic operating conditions by ITM (CO)
- Validation of PEM electrolysis stacks under steady-state and realistic dynamic operating conditions by ITM (CO)
- Publishable report on MEA development and characterisation by EWII (CO)
5. Advanced systems and components and their control
- Fact based assessment of a state of the art PEM Electrolyser by ITM (CO)
- Final design of a low cost PEM electrolyser system and safety study on simplified BoP by ITM (CO)
- Advanced PEM stack integrated in the 180 kW prototype PEM electrolyser system by ITM (CO)
- Cost and Life cycle analysis on the advanced PEM electrolyser by CNR-ITAE (CO)
6. Field testing and validation
- Detailed lay-out of the integration of the electrolyser unit with the energy grids at the field test site of Emden by SWE (CO)
- Building, safety and compliance testing and factory acceptance test of the electrolyser unit by ITM (PU)
- Physical integration of the electrolyser and customer site acceptance test by SWE (PU)
- Report on field tests and results evaluation including operational and maintenance manuals by SWE (CO)
- Publishable report on field test results by HS EL (PU)
7. Dissemination and preparative exploitation activities
- Project website, including Project templates (reports, presentations, logo), database for Dissemination (stakeholders, interest groups, contact details) by UNR (PU)
- Dissemination plan by UNR (PU)
- Exploitation Plan by ITM (CO)