Published deliverables
Downloads within the HPEM2GAS project
The results within the HPEM2GAS project have been divided in 7 different categories, please click the category to view the available reports.
Most of the reports are confidential (CO), in those cases only a public summary is available, which can be quite short.
Result categories
- Specification, Harmonisation and regulation for grid services
- PEM electrolysis components, optimization and scaling-up
- MEAs and Stack optimisation
- System design and prototyping
- Field testing and validation
- Dissemination and preparative exploitation activities
- External downloads & more..
2. Specification, Harmonisation and regulation for grid services
- Published: Protocols for characterisation of system components and electrolysis system assessment by CNR-ITAE (PU)
- Published: Complete set of technical and operational requirements for field-testing by SWE (CO)
- Published: Background document on policies and regulations for grid-balancing service by CNR-ITAE (PU)
3. PEM electrolysis components, optimization and scaling-up
- Published: Progress report on membrane and catalyst development and preparation of first batches of large area membranes and catalyst components for MEA development by SLV (CO)
- Final report on membrane development and the scaling up of membrane production and ‘pilot production’ of batches of large area membranes for MEA development (TRL6) by SLV (CO)
- Published: Final report on the manufacturing of the catalysts including recombination catalysts meeting the specifications and scale-up to kg batches by CNR-ITAE (CO)
- Published: Publishable report on catalyst development by CNR-ITAE (PU)
4. System design and prototyping
- Published: MEA development with high catalyst utilisation by EWII (CO)
- Published:Report on final MEA performance and stability properties by EWII (CO)
- Published:Data-set on stack assembling and testing under realistic operating conditions by ITM (CO)
- Published:Validation of PEM electrolysis stacks under steady-state and realistic dynamic operating conditions by ITM (CO)
- Published:Publishable report on MEA development and characterisation by EWII (PU)
5. Advanced systems and components and their control
- Published:Fact based assessment of a state of the art PEM Electrolyser by ITM (CO)
- Published:Final design of a low cost PEM electrolyser system and safety study on simplified BoP by ITM (CO)
- Published:Advanced PEM stack integrated in the 180 kW prototype PEM electrolyser system by ITM (CO)
- Published: Cost and Life cycle analysis on the advanced PEM electrolyser by CNR-ITAE (CO)
6. Field testing and validation
- Published:Detailed lay-out of the integration of the electrolyser unit with the energy grids at the field test site of Emden by SWE (CO)
- Published:Building, safety and compliance testing and factory acceptance test of the electrolyser unit by ITM (PU)
- Published: Physical integration of the electrolyser and customer site acceptance test by SWE (PU)
- Report on field tests and results evaluation including operational and maintenance manuals by SWE (CO)
- Publishable report on field test results by HS EL (PU)
7. Dissemination and preparative exploitation activities
- Published:Project website, including Project templates (reports, presentations, logo), database for Dissemination (stakeholders, interest groups, contact details) by UNR (PU)
- Published:Dissemination plan by UNR (PU)
- Published: Exploitation Plan by ITM (CO)
8. External downloads & more..
- Project Workshop Flyer
- Project Flyer
- Newsletter I – March 2017
- Newsletter II – September 2017
- Newsletter III – April 2018
- Newsletter IV + Registration – November 2018